Busy weekend on the new shop.
LT "Firedup" Pack and Joe stopped by to help "A LOT"
LT "Firedup" "The Cat Scarer" Pack and Jeff White. Jeff stopped by Friday night after work to visit.
Last of the junk to leave the "shop"
First ceiling panel up.
Temp lights and the last wall panel to come down for insulation.
Cutting out for the "new" door.
LT and the "Original" Joe. How can a door kick 3 men's butt's
Door frame finally in.
Joe taking a break. Looong hot days.
Ceiling insulated and panels going up.
Work central
Hey, the door fits. Firedup.
Walls in, Patching joints and getting ready for paint.
Door in.